Early Production of Band-e-Karkhe Oil Field Project

 

Project:  

 Early Production of Band-e-Karkhe Oil Field Project

Client:  
 PEDEC Co./ Petro Farayand Karkhe
Main Contractor:    Gordavaran Farashband Co.
Engineering Subcontractor:  
 Rahbord Energy
Project Location:  
  Khouzestan / Ahwaz
Capacity:  

 15000 BBLs/day Crude oil Production Plant

 3 wellhead Facilities

 3 flow Lines for Connecting wellheads to Production Plant

 60 km Transmission Pipeline

 Non Industrial building Control & Substation

 Utility Systems required for Production Plant
Technical Category:  
 Oil Production Plants, Oil Wellheads and     Underground  Pipelines
Services Performed:  

 Detail and Procurement Engineering & As-built Drawing

Estimated Man-hour:  
 40,000
Project Status:  
 Finished