Sa’adat Abad Oil Field Development Project

| Project: |
Sa’adat Abad Oil Field Development |
| Client: |
Iranian Central Oil Fields Company (ICOFC) |
| EPC Contractor: |
Global Petro Tech Kish E&P Company |
| Engineering Subcontractor: | Rahbord Energy |
| Project Location: |
90 km far from South-East of Shiraz |
| Capacity: |
Increase Production from 4.000 bbl/day to 7.000 bbl/day |
| Technical Category: |
Oil Wellheads and Flowlines |
| Services Performed: |
Detail Engineering, Procurement Eng. and Site Engineering |
| Estimated Man-hour: |
15,000 |
| Project Status: |
Ongoing |