Early Production of Band-e-Karkhe Oil Field Project

| Project: |
Early Production of Band-e-Karkhe Oil Field Project |
| Client: |
PEDEC Co./ Petro Farayand Karkhe |
| Main Contractor: | Gordavaran Farashband Co. |
| Engineering Subcontractor: |
Rahbord Energy |
| Project Location: |
Khouzestan / Ahwaz |
| Capacity: |
15000 BBLs/day Crude oil Production Plant 3 wellhead Facilities 3 flow Lines for Connecting wellheads to Production Plant 60 km Transmission Pipeline Non Industrial building Control & Substation Utility Systems required for Production Plant |
| Technical Category: |
Oil Production Plants, Oil Wellheads and Underground Pipelines |
| Services Performed: |
Detail and Procurement Engineering & As-built Drawing |
| Estimated Man-hour: |
40,000 |
| Project Status: |
Finished |